Kirchliche Solarstrom Beteiligungsgesellschaft OKR
Location: Stuttgart
Evangelischer Oberkirchenrat, 60,6 kWp, commissioning 2004
Partner: Evangelische Landeskirche Württemberg
Legal Society: Kirchliche Solarstrom Beteiligungsgesellschaft mbH & Co. KG
Limited partners: 38
Special feature: first destruction of a PV plant afer 18 years due to demolition of the building
Kreisgymnasium Bad Krozingen KBK
Location: Bad Krozingen
Kreisgymnasium, 66 kWp, commissioning 2004
Partner: Landratsamt Breisgau-Hochschwarzwald
Legal Society: Solarstrom Beteiligungsgesellschaft mbH & Co. KG Kreisgymnasium Bad Krozingen
Limited partners: 31
Special feature: mounted on roof with low inclination due to structural strength; later a 2nd plant was added at the other roof
Stuttgarter Schulen
Locations: Stuttgart
– Anne-Frank-Realschule, 57 kWp, commissioning 2005
– Grund- und Hauptschule Plieningen, 80 kWp, commissioning 2005
– Elly-Heuss-Knapp-Gymnasium, 73 kWp, commissioning 2005
– Rilke Realschule, 44 kWp, commissioning 2005
– Königin-Charlotte-Gymnasium, 55 kWp, commissioning 2006
Legal Society: city of Stuttgart
Gesellschaft: Ecovision Solarfonds GmbH&Co. KG Stuttgarter Schulen
Limited partners: 78
Special feature: since the beginning very successful project, first of it´s kind with city of Stuttgart
Schwerter zu Solarscharen
Location: Bad Rappenau / Siegelsbach
120 one-axis Trackers with 417 kWp, commissioning 2008
Partner: Bundesrepublik Deutschland represented by BIMA und Bundesforst
Legal Society: ecovision Solarfonds GmbH&Co. KG Schwerter zu Solarscharen
Limited partners: 61
Special feature: our most spectacular and technically most ambitious project due to mechanical tracking
SWE Bürgersolarfonds I
Location: Emmendingen, 5 buildings of city
– 62 kWp, Meerweinschule, Dezember 2007
– 14 kWp, Dach der Feuerwehr, Februar 2008
– 61 kWp, Sporthalle des Goethe-Gymnasiums, Dezember 2008
– 42 kWp, Kindergarten „An der Wiese“, Mai 2009
– 40 kWp, Grundschule in Kollmarsreute, November 2009
Partner: city and utility of Emmendingen
Legal Society: SWE Bürgersolarfonds GmbH&Co KG
Limited partners: 59
Special feature: very successful cooperation with local utility, therefore more 4 projects followed
SWE Bürgersolarfonds II
Location: Emmendingen
Bauhof und Realschule, 2 buildings of city
– Bauhof, 44,7 kWp, commissioning 2010
– Altdorfhalle, 42,5kWp, commissioning 2011
Partner: city and utility of Emmendingen
Legal Society: SWE Bürgersolarfonds II GmbH&Co KG
Limited partners: 19
Special feature: the plant must always be adapted to the local conditions not vice versa
SWE Busbahnhof
Location: Emmendingen
Busbahnhof/Bahnhof, 62,1kWp, commissioning 2010
Partner: city and utility of Emmendingen
Legal Society: SWE Bürgersolarfonds GmbH&Co KG
Limited partners: 15
Special feature: located between high speed train and bus station, optically very nice
SWE Bürgersolarfonds III
Location: Emmendingen
Stadtwerke und Realschule, 2 buildings of city
– Stadtwerke-Gebäude, 54,3 kWp, commissioning 2011
– Altdorfhalle, 26,3 kWp, commissioning 2011
Partner: city and utility of Emmendingen
Legal Society: SWE Bürgersolarfonds III GmbH&Co KG
Limited partners: 14
Special feature: with increasing confidence the limited partners: invest more in each new project
DfM – Solar Dreams
Location: Ebersbach / Fils
66,09 kWp auf Wohn- und Pflegestift, commissioning 2010
Partner: congregation
Legal Society: Solar Dreams GbR
Limited partners: 6
Special feature: due to the small size of the plant a non-trading partnership was chosen. More complex feed-in situation on 3 roofs
DfM Kennenburg
Location: Esslingen
Pflegestift, 66,2kWp, commissioning 2011
Partner: congregation
Legal Society: Solar dfm Kennenburg GbR
Limited partners: 3
Special feature: we want to fly at higher game – plant installed on 6th floor rooftop
Solarscharen II
Location: Bad Rappenau / Siegelsbach
13 former atomic bunkers and 3 buildings
504,9 kWp; commissioning 2012
Partner: Bundesrepublik Deutschland represented by BIMA und Bundesforst
Legal Society: ecovision Solarfonds GmbH&Co. KG Solarscharen II
Limited partners: 14
Special feature: former atomic bunkers converted into solar producers
Solarscharen Drei
Location: Bad Rappenau / Siegelsbach
Ground-based plant with 1167 kWp, commissioning 2011
Partner: Bundesrepublik Deutschland represented by BIMA und Bundesforst
Legal Society: ecovision Solarfonds GmbH&Co. KG Solarscharen Drei
Limited partners: 21
Special feature: classic design of the PV plant– outperforming target yields at this historical location
Solarscharen Vier/Sechs
Location: Bad Rappenau / Siegelsbach
Ground-based plant with 1167 kWp, commissioning 2011
Partner: Bundesrepublik Deutschland represented by BIMA und Bundesforst
Legal Society: ecovision Solarfonds GmbH&Co. KG Solarscharen Vier
Limited partners: 21
Special feature: one site – different special purpose vehicles (societies)
Oberfranken IV / SF 9
Location: Döhlau / Oberfranken
Ground-based plant with 2318 kWp, commissioning 2012
Partner: local private owners
Legal Society: Solarfonds 9 – Oberfranken IV GmbH&Co KG
Limited partners: 60, thereof 39 members of a cooperative
Special feature: innovative combination of cooperatives and limited partners plus 2 general partners
SWE Bürgerwind
Location: Weißmoos / Schweighausen
Windturbine, 3 000 kWp, commissioning 2013
Partner: local private owners
Legal Society: SWE Bürgerwind I GmbH&Co KG
Limited partners: utility Emmendingen + 20 limited partners + 400 members of 2 cooperatives
Special feature: our first wind (Repowering-) project; outperforming since the beginning
Agrardächer/ SF12
Location: Roofs of several farms on 3 locations
– Harzungen (Thüringen); 1011,8 kWp
– Pfaffendorf (Brandenburg); 1006,3 kWp
– Rothenburg (Sachsen), 1000,3 kWp
commissioning 2013
Partner: the farm owners
Legal Society: Solarfonds Agrardächer 12 GmbH & Co. KG
Limited partners: 20 limited partners + 27 members of a cooperative
Special feature: combining farming and solar PV electricity generation at the same location
Bürgerwind Lahr2 – Seelbach
Location: Seelbach / Langenhard-Kempfenbühl
Windturbine E1 38, 4 200 kWp, commissioning 2021
Partner: local private owner
Legal Society: Limited partners: 20, plus 113 members of a cooperative, 4 subordinated loans from cooperatives
Special feature: innovative combination of cooperatives and limited partners plus 2 general partners and four subordinated loans from cooperatives; fast realisation